
John Knox Village – VAL (2020)
Lee’s Summit, MO
New Construction
Haren worked with John Knox Village and SFCS architects to complete the construction of 25 assisted living units in the new Village Assisted Living building.
The new bathrooms feature roll-in showers and are equipped with linear drains for a smooth transition from the vinyl floor covering the drain and the shower pan.
Weather proved difficult at the beginning of 2019. Haren was able to advance the schedule by pre-framing walls at a separate location on the JKV campus.