Fort Leavenworth Chapel
Leavenworth, KS
New Construction
Haren Companies completed the new construction of the Fort Leavenworth Chapel, creating a welcoming space that includes a sanctuary, classrooms, cafeteria, and fellowship areas.
The structure features cold-formed steel trusses for enhanced strength and durability, while the walls are constructed with steel-framed studs. The Haren team showcased their expertise throughout the project, handling the framing, drywall, stucco, insulation, and interior finishes to bring the chapel’s design to life with precision and quality craftsmanship.