HarenLaughlin Construction began construction on The District at City Center in Lenexa, KS near the end of 2017. The 175 unit mixed-use property features cold-formed steel construction creating a longer-lasting, better quality, and safer structure. Read more in the Metro Wire Media article about how we teamed up with the architect, the developers, and our subcontractors to put together a package that makes sense.